Freeway A100

In the southeast of Berlin, the freeway A100 will be extended by a section of approximately 3,2 km Neukölln interchange to the Treptower Park junction. This section comprised 1.850 m trough section, 457 m tunnel section, two connection points, ten bridge structures and various supporting structures.

Ort
Berlin
Auftraggeber/Bauherr
Senatsverwaltung für Stadtentwicklung und Umwelt, Berlin
Zeitraum
since 2007
Leistungen
  • design and planning of the insitu soil investigation concept
  • tendering and supervision of geotechnical field tests
  • geotechnical laboratory experiments
  • subsoil assessment and start-up consultancy for the route and all structures
  • hydrological and hydrogeological report
  • investigation and evaluation of the influence of the groundwater conditions by construction measure
  • investigation of the impact of planned troughs on groundwater temperature
  • contaminated sites investigation and evaluation of  groundwater quality
  • planning accompanying geotechnical consulting
  • additional investigations (contaminated sites, water, ground, construction logistics) in the context of the design planning
  • geotechnical examination of the design planning of the construction pit
  • modelling simulation of groundwater heating